
Integrated Approach Towards the Application of Horizontal Wells to Improve Waterflooding Performance
Author(s) -
Chris Liner,
D. Kerr,
Mohan Kelkar
Publication year - 1998
Language(s) - English
Resource type - Reports
DOI - 10.2172/3789
Subject(s) - petroleum engineering , drilling , completion (oil and gas wells) , reservoir engineering , reservoir simulation , injection well , engineering , geology , petroleum , mechanical engineering , paleontology
Integrated Approach Towards the Application of Horizontal Wells to Improve Waterflooding Performance scanner logs through a newly drilled well. By combining the state-of-the-art data with conventional core and log data, we developed a detailed reservoir description based on an integrated approach. After conducting extensive reservoir simulation studies, we evaluated alternate reservoir management strategies to improve the reservoir performance including drilling of a horizontal injection well. We observed that selective completion of many wells followed by an increase in the injection rate was the most feasible option to improve the performance of the Self Unit. This management plan is currently being implemented and the performance is being Stage II of the project will involve selection of part of the same reservoir (Berryhill Unit - Tract 7), development of reservoir description using only conventional data, simulation of flow performance using developed reservoir description, selection of an appropriate reservoir management plan, and implementation of the plan followed by monitoring of reservoir performance. During the summer of 1995, we started implementing the reservoir management plan in the Self Unit. Last quarter, after evaluating each individual well, we decided to install electrical submersible pumps to produce three wells. The other three wells required the use of rod pumps. Production from the field improved significantly once the pumps were installed. Over the last two years, an average daily production has been approximately 40 to 45 bbls/day. Compared to a base line production of 13 bbls/day before the implementation, this is more than a 200% increase in production. determined. We are finalizing the AFE for the overall implementation. This overall implementation will include converting well no 61 into an injector, re-perforating wells M-3A and M-4A, and drilling a deviated production well between 61 and M-3A/M-4A i n east west direction. The total length is expected to be about 500 ft, and the well would be completed in zones A through D. We expect to drill this well in the next quarter and provide some preliminar