z-logo
open-access-imgOpen Access
Electric Power Research Institute, Environmental Control Technology Center monthly report to the Steering Committee, June 1994
Publication year - 1994
Language(s) - English
Resource type - Reports
DOI - 10.2172/37661
Subject(s) - steering committee , center (category theory) , unit (ring theory) , electric power , research center , environmental science , engineering , aeronautics , power (physics) , political science , engineering management , psychology , physics , chemistry , quantum mechanics , law , crystallography , mathematics education
Operations and maintenance continued this month at the Electric Power Research Institute`s Environmental Control Technology Center. Testing on the 4.0 MW Pilot FGD unit continued this month with High Velocity Scrubbing and the Tampa Electric Company (TECO) Tailored Collaboration test block. Additionally, Phase III of the Toxics Removal/Carbon Injection test block was conducted concurrently with FGD testing. At the beginning of the month, a second phase of third-party testing began for Suncor, Inc. The Suncor Gypsum Sample Collection test block (MSUN) began on June 5 on the 0.4 MW Mini-Pilot Wet FGD unit. Testing was completed on June 13. On the Cold-Side Selective Catalytic Reduction (SCR) unit, testing continued this month as ammonia slip measurements were conducted under low catalyst inlet temperatures and at baseline conditions

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here