Open Access
324 Facility B-Cell quality process plan
Author(s) -
J.L. Carlson
Publication year - 1998
Language(s) - English
Resource type - Reports
DOI - 10.2172/353291
Subject(s) - milestone , rack , waste management , purex , environmental science , engineering , chemistry , mechanical engineering , archaeology , chromatography , extraction (chemistry) , history , solvent extraction
B-Cell is currently being cleaned out (i.e., removal of equipment, fixtures and residual radioactive materials) and deactivated. TPA Milestone M-89-02 dictates that all mixed waste and equipment be removed from B-Cell by 5/31/99. The following sections describe the major activities that remain for completion of the TPA milestone. These include: Size Reduce Tank 119 and Miscellaneous Equipment; Load and Ship Low-Level Waste; Remove and Size Reduce the 1B Rack; Collect Dispersible Material from Cell Floor; Remove and Size Reduce the 2A Rack; Size Reduce the 1A Rack; Load and Ship Mixed Waste to PUREX Tunnels; and Move Spent Fuel to A-Cell