AX Tank Farm waste retrieval alternatives cost estimates
Author(s) -
Susan Krieg
Publication year - 1998
Language(s) - English
Resource type - Reports
DOI - 10.2172/344970
Subject(s) - procurement , waste management , cost estimate , environmental science , engineering , business , systems engineering , marketing
This report presents the estimated costs associated with retrieval of the wastes from the four tanks in AX Tank Farm. The engineering cost estimates developed for this report are based on previous cost data prepared for Project W-320 and the HTI 241-C-106 Heel Retrieval System. The costs presented in this report address only the retrieval of the wastes from the four AX Farm tanks. This includes costs for equipment procurement, fabrication, installation, and operation to retrieve the wastes. The costs to modify the existing plant equipment and systems to support the retrieval equipment are also included. The estimates do not include operational costs associated with pumping the waste out of the waste receiver tank (241-AY-102) between AX Farm retrieval campaigns or transportation, processing, and disposal of the retrieved waste

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here