z-logo
open-access-imgOpen Access
Tank 241-T-112, cores 185 and 186 analytical results for the final report
Author(s) -
F.H. Steen
Publication year - 1997
Publication title -
osti oai (u.s. department of energy office of scientific and technical information)
Language(s) - English
Resource type - Reports
DOI - 10.2172/328505
Subject(s) - confidence interval , statistics , environmental science , engineering , waste management , mathematics
This document is the analytical laboratory report for tank 241-T-112 push mode core segments collected between February 26, 1997 and March 19, 1997. The segments were subsampled and analyzed in accordance with the Tank 241-T-112 Push Mode Core Samplings and Analysis Plan (TSAP) and the Safety Screening Data Quality Objective (DQO). The analytical results are included in the data summary table. None of the samples submitted for Differential Scanning Calorimetry and Total Alpha Activity (AT) exceeded notification limits as stated in the TSAP. The statistical results of the 95% confidence interval on the mean calculations are provided by the Tank Waste Remediation Systems Technical Basis Group in accordance with the Memorandum of Understanding and are not considered in this report

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here
Accelerating Research

Address

John Eccles House
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom