z-logo
open-access-imgOpen Access
Tank 214-AW-105, grab samples, analytical results for the finalreport
Author(s) -
R.A. Esch
Publication year - 1997
Language(s) - English
Resource type - Reports
DOI - 10.2172/328494
Subject(s) - compatibility (geochemistry) , environmental science , analyte , waste management , chromatography , engineering , materials science , chemistry , composite material
This document is the final report for tank 241-AW-105 grab samples. Twenty grabs samples were collected from risers 10A and 15A on August 20 and 21, 1996, of which eight were designated for the K Basin sludge compatibility and mixing studies. This document presents the analytical results for the remaining twelve samples. Analyses were performed in accordance with the Compatibility Grab Sampling and Analysis Plan (TSAP) and the Data Quality Objectives for Tank Farms Waste Compatibility Program (DO). The results for the previous sampling of this tank were reported in WHC-SD-WM-DP-149, Rev. 0, 60-Day Waste Compatibility Safety Issue and Final Results for Tank 241-A W-105, Grab Samples 5A W-95-1, 5A W-95-2 and 5A W-95-3. Three supernate samples exceeded the TOC notification limit (30,000 microg C/g dry weight). Appropriate notifications were made. No immediate notifications were required for any other analyte. The TSAP requested analyses for polychlorinated biphenyls (PCB) for all liquids and centrifuged solid subsamples. The PCB analysis of the liquid samples has been delayed and will be presented in a revision to this document

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here