z-logo
open-access-imgOpen Access
Tank waste remediation system simulation analysis retrieval model
Author(s) -
R.A. Fordham
Publication year - 1996
Publication title -
osti oai (u.s. department of energy office of scientific and technical information)
Language(s) - English
Resource type - Reports
DOI - 10.2172/327599
Subject(s) - computer science , section (typography) , process (computing) , plan (archaeology) , set (abstract data type) , flow (mathematics) , operations research , process engineering , engineering , mathematics , programming language , geography , archaeology , geometry , operating system
The goal of simulation was to test tll(., consequences of assumptions. For the TWRS SIMAN Retrieval Model, l@lie specific assumptions are primarily defined with respect to waste processing arid transfer timing. The model tracks 73 chem1913ical constituents from underground waste tanks to glass; yet, the detailed (@hemistrv and complete set of unit operations of the TWRS process flow sheet are represented only at the level necessary to define the waste processing and transfer logic and to estimate the feed composition for the treatment facilities. Tlierefor(,, the model should net be regarded as a substitute for the TWRS process flow sheet. Pra(!ticallv the model functions as a dyrt(imic extension of the flow sheet model. I I The following sections present the description, assunipt@ions, architecture, arid evalua- tion of the TWRS SIMAN Retrieval Model. Section 2 describes the model in terms of an overview of the processes represented. Section 3 presents the assumptions for the simulation model. Specific assumptions 9.tt(l parameter values used in the model are provided for waste retrieval, pretreatment, low-level waste (LLNN7) immobilization, and high-level waste (HLW) immobilization functions. Section 4 describes the model in terms of its functional architec- rare to d(@fine a basis for a systematic evaluation of the model. Finally, Section 5 documents an independent test and evaluation of the niodel`s performance (i.e., the verification and validation). Additionally, Appendix A gives a complete listing of the tank inventory used. Appendix B documents the verification and validation plan that was used for the (Section 5) evaluation work. A description and listing of all the model variables is given in Appendix C along with a complete source listing

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here
Accelerating Research

Address

John Eccles House
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom