W-087 Operational test report. Revision 1
Author(s) -
Arnav Joshi
Publication year - 1997
Language(s) - English
Resource type - Reports
DOI - 10.2172/326440
Subject(s) - interlock , circuit breaker , leak , test (biology) , instrumentation (computer programming) , leak detection , reliability engineering , computer science , automotive engineering , engineering , electrical engineering , operating system , geology , paleontology , environmental engineering
This Acceptance Test Procedure/Operational Test Procedure (ATP/OTP) has been prepared to demonstrate that the Electrical/Instrumentation and Mechanical systems function as required by project criteria and to verify proper operation of the integrated system including the interlocks. The equipment to be tested includes the following: a. Leak detection system operation and controls. b. Electrical interlocks.- C. Transfer pump oper ation. d. Vacuum breaker system interlocks
Accelerating Research
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom
Address
John Eccles HouseRobert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom