Accident consequence calculations for project W-058 safetyanalysis
Author(s) -
J.C. Van Keuren
Publication year - 1997
Publication title -
osti oai (u.s. department of energy office of scientific and technical information)
Language(s) - English
Resource type - Reports
DOI - 10.2172/326418
Subject(s) - leak , environmental science , section (typography) , environmental remediation , engineering , petroleum engineering , environmental engineering , contamination , computer science , ecology , biology , operating system
Accident consequence analyses have been performed for Project W-058, the Replacement Cross Site Transfer System. using the assumption and analysis techniques developed for the Tank Remediation Waste system Basis for Interim Operation. most potential accident involving the FISTS are bounded by the TWRS BIO analysis. However, the spray leak and pool leak scenarios require revised analyses since the RCSTS design utilizes larger diameter pipe and higher pressures than those analyzed in the TWRS BIO. Also the volume of diversion box and vent station are larger than that assumed for the valve pits in the TWRS BIO, which effects results of sprays or spills into the pits. the revised analysis for the spray leak is presented in Section 2, for the above ground spill in Section 3, for the presented in Section 2, for the above ground spill in Section 3, for the subsurface spill forming a pool in Section 4, and for the subsurface pool remaining subsurface in Section 5. The conclusion from these sections are summarized below

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here
Accelerating Research

Address

John Eccles House
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom