
Design review report: project development specifications for project W-314, tank farm resoration and safe operation, phase I
Author(s) -
K.A. Boes
Publication year - 1997
Language(s) - English
Resource type - Reports
DOI - 10.2172/325874
Subject(s) - procurement , engineering , scope (computer science) , pipeline transport , civil engineering , computer science , mechanical engineering , business , marketing , programming language
This Design Review Report (DRR) documents the closure of all Review Cormnent Record sheets associated with the design reviews conducted for the Project W-314 Phase 1 Project Development Specification (PDS) Requirements Analysis. The DRR includes the documented comments and their respective dispositions for the W-314 PDS Requirements Analysis documents associated with Transfer Piping, Valve Pit Manifolds, Pit Leak Detection, Master Pump Shutdown, and Special Protective Coating. Acceptance of the comment dispositions and closure of the review comments is indicated by the Signatures of the participating reviewers