z-logo
open-access-imgOpen Access
Definition and means of maintaining the supply ventilation system seismic shutdown portion of the PFP safety envelope
Author(s) -
Rüdiger Keck
Publication year - 1997
Language(s) - English
Resource type - Reports
DOI - 10.2172/325844
Subject(s) - operability , shutdown , envelope (radar) , reliability engineering , process safety , limiting , safety instrumented system , section (typography) , process (computing) , engineering , ventilation (architecture) , computer science , operations management , mechanical engineering , telecommunications , nuclear engineering , work in process , operating system , radar
The purpose of this document is to record the technical evaluation of the Limiting Condition for Operation (LCO) described in the Plutonium Finishing Plant (PFP) Operational Safety Requirements, WHC-SD-CP-OSR- 010, Rev. 0. Kay 1994, Section 3.2.3, `Supply Ventilation System Seismic Shutdown.` This document, with its appendices, provides the following: 1. The system functional requirements for determining system operability (Section 3). 2. Evaluations of equipment to determine the safety boundary for the system (Section 4). 3. A list of annotated drawings which show the safety envelope boundaries (Appendix C). 4. A list of the safety envelope equipment (Appendix B). 5. Functional requirements for the individual safety envelope equipment, including appropriate setpoints and process parameters (Section 4.1). 6. A list of the operational, maintenance and surveillance procedures necessary to operate and maintain the system equipment within the safety envelope (Sections 5 and 6 and Appendix A)

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here
Accelerating Research

Address

John Eccles House
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom