z-logo
open-access-imgOpen Access
Gas and liquid sampling for closed canisters in KW Basin - Work Plan
Author(s) -
C.C. Pitkoff
Publication year - 1995
Language(s) - English
Resource type - Reports
DOI - 10.2172/26546
Subject(s) - scope (computer science) , sampling (signal processing) , work (physics) , test plan , plan (archaeology) , schedule , baseline (sea) , computer science , systems engineering , quality assurance , environmental science , engineering , mechanical engineering , operations management , geology , mathematics , telecommunications , operating system , statistics , oceanography , external quality assessment , weibull distribution , programming language , paleontology , detector
Work Plan for the design and fabrication of gas/liquid sampler for closed canister sampling in KW Basin. This document defines the tasks associated with the design, fabrication, assembly, and acceptance testing equipment necessary for gas and liquid sampling of the Mark I and Mark II canisters in the K-West basin. The sampling of the gas space and the remaining liquid inside the closed canisters will be used to help understand any changes to the fuel elements and the canisters. Specifically, this work plan will define the scope of work and required task structure, list the technical requirements, describe design configuration control and verification methodologies, detail quality assurance requirements, and present a baseline estimate and schedule

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here