Conceptual design plans for the FY 1993 line items
Publication year - 1988
Language(s) - English
Resource type - Reports
DOI - 10.2172/263008
Subject(s) - component (thermodynamics) , transport engineering , engineering , construction engineering , engineering management , computer science , operations management , systems engineering , thermodynamics , physics
This Facilities Capability Assurance Program (FCAP) project provides for the design and construction of a reconfigured production facility(ies) for Mound`s non-nuclear weapons components. Existing buildings would be rehabilitated in order to locate final production/assembly areas within close proximity and in a facility suitable to operations of this nature. Ancillary operations will be located in nearby buildings, also rehabilitated, in order to provide support to final production with minimal handling and travel-time. Benefits of this reconfiguration include: reduced labor, space requirements, and product cycle time; maximum flexibility to accommodate new mission assignments without new buildings; restores existing manufacturing facilities to a condition that is conducive to state-of-the-art operations. This project is mound`s top priority project for FY93