
Program status 3. quarter -- FY 1994: ITER and technology
Publication year - 1994
Language(s) - English
Resource type - Reports
DOI - 10.2172/257422
Subject(s) - fabrication , materials science , neutron , electromagnetic coil , nuclear engineering , nuclear physics , electrical engineering , physics , engineering , medicine , alternative medicine , pathology
During this quarter all technical work and documentation of the PULSAR design was completed. They also assisted UCLA in the planning of the DEMO program.In the area of RF technology, a decision was made to fabricate 4in x 4in gyrotron distributed window. An finally, they obtained good agreement between code predictions and measured data for the up and down field redeposition of tungsten in the DIMES-8 experiment