z-logo
open-access-imgOpen Access
LWRHU EB weld development
Author(s) -
L. A. Greene
Publication year - 1980
Language(s) - English
Resource type - Reports
DOI - 10.2172/254968
Subject(s) - frit , welding , electron beam welding , materials science , cathode ray , metallurgy , penetration (warfare) , nuclear engineering , engineering , electron , physics , nuclear physics , operations research
Electron beam weld development studies were performed for both the platinum frit vent-to-vent cap weld and also the vent cap-to-body weld for the LWRHU Project using a Hamilton Standard EBW-6 Electron Beam Welder. A total of six (6) development welds each was performed to establish welding parameters and procedures which would produce satisfactory and acceptable welds. The relatively small size of the platinum frit vent dictated that the frit-to-vent cap weld would have to be limited as to depth of penetration and also to minimize the reduction of the porous frit areas

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here