z-logo
open-access-imgOpen Access
Summary of field operations, well TRN-1
Author(s) -
J.E. Fritts,
Ellen Thomas,
John McCord
Publication year - 1996
Publication title -
osti oai (u.s. department of energy office of scientific and technical information)
Language(s) - English
Resource type - Reports
DOI - 10.2172/234616
Subject(s) - bedrock , geology , borehole , drilling , hydrogeology , aquifer , alluvium , drill , hydrology (agriculture) , geomorphology , groundwater , geotechnical engineering , engineering , mechanical engineering
TRN-1 was drilled near the SE corner of Kirtland Air Force Base to a depth of 510 feet. This well is in the Site-Wide Hydrogeologic Characterization task field program, which is part of Sandia`s Environmental Restoration Project. After drilling, the borehole was logged, plugged to a depth of 352 ft, and completed as a monitoring well. Sand pack interval is from 305 to 352 ft and the screen interval is from 320 to 340 ft. During field operations, important subsurface geologic and hydrologic data were obtained (drill cuttings, geophysical logs of alluvial cover). Identification of the Abo formation in the subsurface will be useful. The subsurface hydrologic data will help define the local hydrostratigraphic framework within the bedrock. Future aquifer testing will be conducted for transmissivity, etc

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here
Accelerating Research

Address

John Eccles House
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom