z-logo
open-access-imgOpen Access
Healy Clean Coal Project. Quarterly technical progress report, October 1, 1995--December 31, 1995
Publication year - 1995
Publication title -
osti oai (u.s. department of energy office of scientific and technical information)
Language(s) - English
Resource type - Reports
DOI - 10.2172/227690
Subject(s) - waste management , particulates , boiler (water heating) , coal , combustion , environmental science , sulfur dioxide , lime , nox , clean coal , coal combustion products , air pollution , power station , pollution , pollution prevention , environmental engineering , engineering , chemistry , materials science , metallurgy , inorganic chemistry , ecology , electrical engineering , organic chemistry , biology
The primary objective of the Healy Clean Coal Project (HCCP) is to conduct a cost-sharing project that will demonstrate a new power plant design which features innovative integration of an advanced combustor and heat recovery system coupled with both high- and low- temperature emission control processes. The primary equipment elements comprising this new power plant design includes entrained combustion systems coupled with a boiler which will produce low- NO{sub x} levels, and function as a limestone calciner and first-stage SO{sub 2} remover in addition to its heat recovery function; a single spray dryer absorber vessel for second-stage sulfur removal; a baghouse for third-stage sulfur and particulate removal; and a lime activation system which recovers unused reagent from particulate collected in the baghouse. The emission levels of SO{sub 2}, NO{sub x}, and particulate to be demonstrated are expected to be less than the Federal New source Performance Standards. The plant design is finalized and all Federal and State permits have been obtained for construction of the project. Construction of the project is on schedule and is within the budget established following the award of the general construction contract. Off-site manufacturing of equipment, including combustor supply and flue gas desulfurization system supply is progressing on schedule and as budgeted

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here
Accelerating Research

Address

John Eccles House
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom