z-logo
open-access-imgOpen Access
Feasibility study on consolidation of Fernald Environmental Management Project depleted uranium materials
Publication year - 1995
Language(s) - English
Resource type - Reports
DOI - 10.2172/171267
Subject(s) - consolidation (business) , schedule , depleted uranium , environmental science , business , uranium , engineering , waste management , computer science , materials science , accounting , metallurgy , operating system
In 1991, the DOE made a decision to close the FMPC located in Fernald, Ohio, and end its production mission. The site was renamed FEMP to reflect Fernald`s mission change from uranium production to environmental restoration. As a result of this change, the inventory of strategic uranium materials maintained at Fernald by DOE DP will need to be relocated to other DOE sites. Although considered a liability to the Fernald Plant due to its current D and D mission, the FEMP DU represents a potentially valuable DOE resource. Recognizing its value, it may be important for the DOE to consolidate the material at one site and place it in a safe long-term storage condition until a future DOE programmatic requirement materializes. In August 1995, the DOE Office of Nuclear Weapons Management requested, Lockheed Martin Energy Systems (LMES) to assess the feasibility of consolidating the FEMP DU materials at the Oak Ridge Reservation (ORR). This feasibility study examines various phases associated with the consolidation of the FEMP DU at the ORR. If useful short-term applications for the DU fail to materialize, then long-term storage (up to 50 years) would need to be provided. Phases examined in this report include DU material value; potential uses; sampling; packaging and transportation; material control and accountability; environmental, health and safety issues; storage; project management; noneconomic factors; schedule; and cost

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here