z-logo
open-access-imgOpen Access
Vault lining for 340 waste handling facility, 300 area
Author(s) -
R. Gary Hollenbeck
Publication year - 1997
Publication title -
osti oai (u.s. department of energy office of scientific and technical information)
Language(s) - English
Resource type - Reports
DOI - 10.2172/16914
Subject(s) - vault (architecture) , coating , computer science , environmental science , waste management , engineering , materials science , structural engineering , nanotechnology
Coating systems by Protection Enterprises, Ameron, Carboline, and Steelcote were evaluated. Each manufacturer has a coating system that is acceptable for use in the 340 Vault (see Appendix A). The choice of which system to use will be made after in-place adhesion tests are complete. The Protection Enterprises coating has the greatest potential for acceptable adhesion with minimal surface preparation. Total project cost for engineering and construction is $1,220,000 including 50% for contingency (see Appendix B). If the existing vault coverblock access hatch can satisfy entry requirements, $95,000 can be saved from the removal of coverblocks and the erection and disassembly of the greenhouse

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here
Accelerating Research

Address

John Eccles House
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom