z-logo
open-access-imgOpen Access
Tank 241-AP-103, grab sample 3AP-97-1 analytical results for the final report
Author(s) -
R.A. Esch
Publication year - 1997
Publication title -
osti oai (u.s. department of energy office of scientific and technical information)
Language(s) - English
Resource type - Reports
DOI - 10.2172/16898
Subject(s) - sample (material) , environmental science , waste management , engineering , chromatography , chemistry
This document is the final analytical laboratory report for the tank 241-AP-103 grab sample. One grab sample was collected from Riser 1{at}90{sup o} on March 19, 1997. Analyses were performed to verify compliance status with corrosion control criteria in accordance with the Letter of Instruction for Tank 241-AP-103 Grab Sample Analyses (LOI) (Field, 1997), the Compatibility Grab Sampling and Analysis Plan (TSAP) (Sasakid, 1997) and the Data Quality Objectives for Tank Farms Waste Compatibility Program (DQO) (Fowler, 1995). The sample results for pH were less than 12 indicating that the tank contents were caustic deficient. A notification for low hydroxide (< 0.01 M) was made to East Tank Farms Operations based on the pH result

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here
Accelerating Research

Address

John Eccles House
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom