z-logo
open-access-imgOpen Access
Analysis of Potential Concerete Floor Decontamination Technologies
Author(s) -
M. A. Ebadian
Publication year - 1997
Language(s) - English
Resource type - Reports
DOI - 10.2172/1407
Subject(s) - nuclear decommissioning , human decontamination , waste management , demolition , radioactive waste , environmental restoration , environmental science , reuse , engineering , civil engineering
During the decontamination and decommissioning (D&D) activities to be conducted at the Femald Environmental Management Project (FEMP), contaminated concrete waste will be generated from the D&D of approximately 200 buildings and other structures [1]. The U.S. Department of Energy (DOE) owns the Fernald site. The site is a contractor-operated federal facility that produced high-purity uranium metal products for the DOE and its predecessor agency, the Atomic Energy Commission, from 1952 to 1989. Thorium being ores were also processed at FEMP, but on a smaller scale. Production activities ceased in 1989, and the production mission of the facility ended formally in 1991. FEMP was included on the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) National Priorities List in 1989. The current mission of the site is environmental restoration according to the requirements specified by CERCLA [1]. Decontamination and decommissioning activities require the treatment of concrete floors to segregate technetium-99 contaminated concrete from the remainder of the concrete. Many proven commercial stiace removal technologies are available. These processes vary in aggressiveness, stiety requirements, waste generation, capital requirements, and operating and maintenance costs

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here