z-logo
open-access-imgOpen Access
Integrated approach towards the application of horizontal wells to improve waterflooding performance. Quarterly progress report, July 1, 1995--September 30, 1995
Author(s) -
B.G. Kelkar,
Chris Liner,
D. Kerr
Publication year - 1995
Publication title -
osti oai (u.s. department of energy office of scientific and technical information)
Language(s) - English
Resource type - Reports
DOI - 10.2172/137343
Subject(s) - petroleum engineering , reservoir simulation , reservoir engineering , drilling , completion (oil and gas wells) , plan (archaeology) , oil field , reservoir modeling , computer science , geology , engineering , petroleum , mechanical engineering , paleontology
The overall purpose of the proposed project is to improve secondary recovery performance of a marginal oil field through the use of an appropriate reservoir management plan. The selection of plan will be based on the detailed reservoir description using integrated approach. We expect that 2 to 5 % of original oil in place will be recovered using this method. This should extend the life of the reservoir by at least 10 years. The project is divided into two stages. In Stage I of the project, we selected part of the Glenn Pool field - Self Unit. We conducted cross bore hole tomography surveys and formation micro scanner logs through newly drilled well. By combining the state of the art data with conventional core and log data, we developed a detailed reservoir description based on integrated approach. After conducting extensive reservoir simulation studies, we evaluated alternate reservoir management strategies to improve the reservoir performance including drilling of a horizontal injection well. We observed that selective completion of many wells followed by an increase in the injection rate was the most feasible option to improve the performance of the Unit. This management plan is currently being implemented and the performance is being monitored. Stage 11 of the project will involve selection of part of the same reservoir (Berryhill Unit - Tract 7), development of reservoir description using only conventional data, simulation of flow performance using developed reservoir description, selection of an appropriate reservoir management plan, and implementation of the plan followed by monitoring of reservoir performance. By comparing the results of two budget periods, we will be able to evaluate the utility of collecting additional data using state-of-the-art technology. In addition, we will also be able to evaluate the application of optimum reservoir management plan in improving secondary recovery performance of marginal oil fields

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here
Accelerating Research

Address

John Eccles House
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom