
Electronics accomplishment report
Author(s) -
L.B. Gnagey
Publication year - 1949
Language(s) - English
Resource type - Reports
DOI - 10.2172/119419
Subject(s) - transformer , thyratron , engineering , electrical engineering , closed circuit , computer hardware , voltage , simulation , computer science
The following items of equipment have been completed: Two Scaler Multipliers, EO-18 and EO-338, undergoing test and adjustment. One Thyratron Heater Control for Scioto Laboratory. One Pilot model switch box for Group 16 hoods at Scioto Laboratory. One Pilot model patch box used as auxiliary to the present switch boxes. Installation of electronic equipment and sorting and cataloguing of stock at Scioto Laboratory has been started. The Y Section induction heaters have been installed electrically. With the present setup in the WD Building, it has been necessary to recycle all the solution which passes through the pH chamber on the clariflocculators. Sufficient tests have been run on the Berkeley Decimal scaler to indicate that, by using a pre-emplifier, it will be a satisfactory replacement for the scaler multiplier. Reworking of B-wall tubes has been held up pending the delivery of neon gas. Further investigations have been made on the frequency compensated constant voltage Sola transformers. Three automatic potential controllers have been modified in accordance with investigations of Group 10. The program of preventative maintenance on automatic potential controllers has resulted in a marked reduction of service calls and down-time for the operating group