z-logo
open-access-imgOpen Access
Integrated science building
Author(s) -
Shane Conklin
Publication year - 2013
Language(s) - English
Resource type - Reports
DOI - 10.2172/1098242
Subject(s) - upgrade , chiller , hvac , engineering , architectural engineering , piping , electrical engineering , air conditioning , civil engineering , mechanical engineering , computer science , operating system , physics , thermodynamics
Shell space fit out included faculty office advising space, student study space, staff restroom and lobby cafe. Electrical, HVAC and fire alarm installations and upgrades to existing systems were required to support the newly configured spaces. These installations and upgrades included audio/visual equipment, additional electrical outlets and connections to emergency generators. The project provided increased chilled water capacity with the addition of an electric centrifugal chiller. Upgrades associated with chiller included upgrade of exhaust ventilation fan, electrical conductor and breaker upgrades, piping and upgrades to air handling equipment

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here