z-logo
open-access-imgOpen Access
UMTRA project water sampling and analysis plan, Naturita, Colorado. Revision 1
Publication year - 1995
Language(s) - English
Resource type - Reports
DOI - 10.2172/108172
Subject(s) - sampling (signal processing) , plan (archaeology) , environmental science , technical standard , engineering , engineering management , computer science , geography , archaeology , telecommunications , operating system , detector
Planned, routine ground water sampling activities for calendar year 1995 to 1997 at the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site near Naturita, Colorado, are described in this water sampling and analysis plan. The following plan identifies and justifies the sampling locations, analytical parameters, detection limits, sampling frequency, and specific rationale for each routine monitoring station at the site. The regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from the US Environmental Protection Agency (EPA) regulations in 40 CFR Part 192. Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here