z-logo
open-access-imgOpen Access
Analysis of Additional CFT Support at Z=0 for the Silicon Half Trough
Author(s) -
H. Cease,
A. Lee
Publication year - 2000
Publication title -
osti oai (u.s. department of energy office of scientific and technical information)
Language(s) - English
Resource type - Reports
DOI - 10.2172/1032087
Subject(s) - barrel (horology) , trough (economics) , washer , silicon , traverse , geometry , physics , structural engineering , engineering , materials science , geology , composite material , mechanical engineering , mathematics , geodesy , optoelectronics , economics , macroeconomics
The D-Zero silicon trough is segmented into two half troughs. Loading to the Central Fiber Tracker Barrel 1 is at both ends and near Z = 0. The loading near Z = 0 is thought to be 4 lbs at 4 points. The point locations are at +/-45 degrees for each half trough on each side of Z = O. An additional support at Z = O is required to prevent beam sag and out of round distortions to the CFT Barrel 1. An additional joining washer will be attached between barrels 1 and 2 at Z = 0. Also a support ring will be attached to the inner diameter of barrel 1 to further help in out of round distortions. Details of the washer and loading are modeled using ANSYS

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here
Accelerating Research

Address

John Eccles House
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom