Analysis of Additional CFT Support at Z=0 for the Silicon Half Trough
Author(s) -
H. Cease,
A. Lee
Publication year - 2000
Publication title -
osti oai (u.s. department of energy office of scientific and technical information)
Language(s) - English
Resource type - Reports
DOI - 10.2172/1032087
Subject(s) - barrel (horology) , trough (economics) , washer , silicon , traverse , geometry , physics , structural engineering , engineering , materials science , geology , composite material , mechanical engineering , mathematics , geodesy , optoelectronics , economics , macroeconomics
The D-Zero silicon trough is segmented into two half troughs. Loading to the Central Fiber Tracker Barrel 1 is at both ends and near Z = 0. The loading near Z = 0 is thought to be 4 lbs at 4 points. The point locations are at +/-45 degrees for each half trough on each side of Z = O. An additional support at Z = O is required to prevent beam sag and out of round distortions to the CFT Barrel 1. An additional joining washer will be attached between barrels 1 and 2 at Z = 0. Also a support ring will be attached to the inner diameter of barrel 1 to further help in out of round distortions. Details of the washer and loading are modeled using ANSYS
Accelerating Research
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom
Address
John Eccles HouseRobert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom