D0 Central Tracking Solenoid Energizatino, Controls, Interlocks and Quench Protection Initial Validation Procedures
Author(s) -
W. Jaskierny,
R. Hance
Publication year - 1998
Publication title -
osti oai (u.s. department of energy office of scientific and technical information)
Language(s) - English
Resource type - Reports
DOI - 10.2172/1032085
Subject(s) - solenoid , interlock , test (biology) , computer science , tracking (education) , jumper , tracking system , reliability engineering , nuclear engineering , engineering , operating system , electrical engineering , psychology , artificial intelligence , paleontology , pedagogy , biology , kalman filter
This note presents the inspection and tests to be performed on the DZERO solenoid energization, controls, interlocks and quench protection system before it is energized for the first time. This test is to be performed with a 5000A jumper at the end of the bus instead of the solenoid. This system is based in DZERO room 511. A copy of this note shall be annotated, signed and dated by the person coordinating the procedure; and filed with the system maintenance records. Annotations shall include comments about any aspect of the procedure that is abnormal or unsuccessful. The following inspections and tests shall be performed by persons knowledgeable about the system. Each individual test step should be reviewed and understood before proceeding with that step
Accelerating Research
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom
Address
John Eccles HouseRobert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom