
SOXAL combined SO{sub x}/NO{sub x} flue gas control demonstration. Quarterly report, July--September 1993
Publication year - 1993
Language(s) - English
Resource type - Reports
DOI - 10.2172/101118
Subject(s) - flue gas , reagent , product (mathematics) , quality (philosophy) , control (management) , process engineering , environmental science , chemistry , waste management , materials science , engineering , analytical chemistry (journal) , computer science , environmental chemistry , mathematics , physics , organic chemistry , geometry , quantum mechanics , artificial intelligence
AQUATECH Systems, a business unit of Allied-Signal Inc., proposes to demonstrate the technical viability and cost effectiveness of the SOXAL process a combined SO{sub x}/NO{sub x} control process on a 3 MW equivalent flue gas slip stream from Niagara Mohawk Power Corporation Dunkirk Steam Station Boiler No. 4, a coal fired boiler. The SOXAL process combines 90+% sulfur dioxide removal from the flue gas using a sodium based scrubbing solution and regeneration of the spent scrubbing liquor using AQUATECH Systems` proprietary bipolar membrane technology. This regeneration step recovers a stream of sulfur dioxide suitable for subsequent processing to salable sulfur or sulfuric acid. Additionally 90+% control of NO{sub x} gases can be achieved in combination with conventional urea/methanol injection of NO{sub 2} gas into the duct. The SOXAL process is applicable to both utility and industrial scale boilers using either high or lower sulfur coal. The SOXAL demonstration Program began September 10, 1991 and is approximately 26 months in duration. During the 6 months of scheduled operations, between January and July of 1993, data was collected from the SOXAL system to define: SO{sub 2} and NO{sub x} control efficiencies; Current efficiency for the regeneration unit; Sulfate oxidation in the absorber; Make-up reagent rates; Product quality including concentrations and compositions; System integration and control philosophy; and Membrane stability and performance with respect to foulants. The program is expected to be concluded in November 1993