Combined treatment of hydroxypropyl guar gum in oilfield fracturing wastewater by coagulation and the UV/H2O2/ferrioxalate complexes process
Author(s) -
Zhenchao Zhang
Publication year - 2017
Publication title -
water science and technology
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.406
H-Index - 137
eISSN - 1996-9732
pISSN - 0273-1223
DOI - 10.2166/wst.2017.552
Subject(s) - guar gum , wastewater , chemistry , chemical oxygen demand , coagulation , dilution , nuclear chemistry , flocculation , polyacrylamide , guar , chromatography , pulp and paper industry , waste management , organic chemistry , polymer chemistry , food science , psychology , physics , psychiatry , engineering , thermodynamics
Hydroxypropyl guar gum is considered to be a main component of oilfield fracturing wastewater (OFW). This work is intended to optimize the experimental conditions for the maximum oxidative degradation of hydroxypropyl guar gum by the coagulation and UV/H 2 O 2 /ferrioxalate complexes process. Optimal reaction conditions were proposed based on the chemical oxygen demand (COD) removal efficiency and UV _ vis spectra analysis. The overall removal efficiency of COD reached 83.8% for a dilution ratio of raw wastewater of 1:2, pH of 4 and FeCl 3 loading of 1,000 mg/L in the coagulation process; the dosage of H 2 O 2 (30%,v/v) was 0.6% (v/v) and added in three steps, the n(H 2 O 2 )/n(Fe 2+ ) was 2:1, n(Fe 2+ )/n(C 2 O 4 2- ) was 3:1 and pH was 4 in the UV/H 2 O 2 /ferrioxalate complexes process; pH was adjusted to 8.5-9 by NaOH and then cationic polyacrylamide (CPAM) of 2 mg/L was added in the neutralization and flocculation process. The decrease in COD during the coagulation process reduced the required H 2 O 2 dosage and improved efficiency in the subsequent UV/H 2 O 2 /ferrioxalate complexes process. Furthermore, COD removal efficiency significantly increased by more than 13.4% with the introduction of oxalate compared with UV/Fenton. The UV _ vis spectra analysis results indicated that the coagulation and UV/H 2 O 2 /ferrioxalate complexes process could efficiently remove the hydroxypropyl guar gum dissolved in OFW. An optimal combination of these parameters produced treated wastewater that met the GB8978-1996 Integrated Wastewater Discharge Standard level III emission standard.
Accelerating Research
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom
Address
John Eccles HouseRobert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom