z-logo
open-access-imgOpen Access
Application of Monte Carlo simulation and PERT/CPM techniques in planning of construction projects: A Case study
Author(s) -
Mertcan Karabulut
Publication year - 2017
Publication title -
periodicals of engineering and natural sciences (pen)
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.225
H-Index - 11
ISSN - 2303-4521
DOI - 10.21533/pen.v5i3.152
Subject(s) - monte carlo method , scheduling (production processes) , project management , computer science , engineering , industrial engineering , operations research , operations management , systems engineering , mathematics , statistics
Construction project scheduling and monitoring is challenging in today's very dynamic business environment. In this study, a project execution tracking system in a medium‒sized construction company was studied. Two different methods were proposed as problem solution for project scheduling and monitoring. Traditional CPM and PERT methods, and Monte Carlo simulation as risk analysis tool were used in this case study. The results show that 186 working days (which is optimistic estimate) is required to finish a luxury villa is determined by CPM method, while Monte Carlo simulation implies that there is 50% of chance that the luxury villa will be done in 205 days, but still there is a risk of 50% that the villa construction may be delayed.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here
Accelerating Research

Address

John Eccles House
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom