Seismic stability of braced excavations next to tall buildings
Author(s) -
Nick O’Riordan,
Ibrahim Almufti
Publication year - 2015
Publication title -
proceedings of the institution of civil engineers. geotechnical engineering/proceedings of ice. geotechnical engineering
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.524
H-Index - 40
eISSN - 1751-8563
pISSN - 1353-2618
DOI - 10.1680/geng.13.00045
Subject(s) - shoring , excavation , engineering , seismic analysis , seismic loading , plan (archaeology) , civil engineering , structural engineering , geotechnical engineering , geology , paleontology
It can take many years to complete the construction of deep, wide and long excavations in urban environments. In seismically active areas, there is a finite probability that a significant earthquake could take place during the construction period. The designer and builder are confronted with the need not only to maintain control of ground and retaining wall movements during the normal construction conditions but also to protect surrounding buildings during a seismic event. It follows that the seismic loads from adjacent structures and their foundations must be considered together with the available load pathways through the propping system. The paper considers the available methods of design and proposes a performance-based design philosophy in which the temporary shoring system and permanent installation are designed for static loading conditions and for the seismic condition only in as much as the performance objectives of adjacent buildings are achieved for various levels of earthquake shaking. An example of the use of performance-based design is presented for the effects of a 130 m tall building of 30 m square plan upon the temporary shoring system for a long and wide excavation. The results obtained are compared with code-based calculations and general conclusions are drawn.