z-logo
open-access-imgOpen Access
Stand structure after thinning in 1–2 m wide corridors in young dense stands
Author(s) -
Kristina Ahnlund Ulvcrona,
Dan Bergström,
Urban Bergsten
Publication year - 2017
Publication title -
silva fennica
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.622
H-Index - 60
eISSN - 2242-4075
pISSN - 0037-5330
DOI - 10.14214/sf.1563
Subject(s) - thinning , forestry , environmental science , geography
Boom corridor thinning (BCT) has been proposed as a cost-effective technique for biomass thinning (BT) in young dense stands. The objective of this study was to determine how various BCT operations affect stand structure following biomass thinning and to compare the results with conventional selective thinning methods. Two series of field experiments were established; BCT 1-series: Three sites in south of Sweden (9 and 11 m in mean and dominating tree height) with five treatments, including a control, conventional selective thinning and three BCT treatments (1 m and 2 m wide corridors and selective BCT). The second BCT series: Three regions in Sweden (in the north, centre and in the south), with two stand sites in each region with different tree heights (4/9 m and 5/10 m in mean/dominating tree height). Treatments were control, precommercial thinning (PCT), conventional selective thinning and BCT (high and low thinning). Following the first biomass thinning, BCT regimes and selective thinning methods resulted in similar stand structures based on the number of possible future crop trees (>80 mm in diameter at breast height). However, BCT maintained a higher diversity of tree sizes as well as more stems per hectare, including deciduous species, than the selective thinning approaches. The stands after BCT should have more vertical complexity, especially when compared to pre-commercial thinning. The structural heterogeneity resulting from BCT may also increase stand biodiversity and ecosystem service values.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here
Accelerating Research

Address

John Eccles House
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom