FUNCTIONS OF HYDROLOGICAL OBJECTS IN THE AREAS OF POST-MINING OPEN PIT “WŁADYSŁAWÓW”
Author(s) -
Mirosława Gilewska,
K. Otremba
Publication year - 2015
Publication title -
journal of ecological engineering
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.311
H-Index - 19
eISSN - 2392-0629
pISSN - 2081-139X
DOI - 10.12912/23920629/60032
Subject(s) - theology , geography , philosophy
Operated by lignite mine “Adams” coal deposits are located in the upland area of the Turkish, belonging to the South Plains macro-region of Wielkopolska. A feature of this region are not only low rainfall, but also the lack of water reservoirs and large rivers. Mining activity has caused major changes in the hydrological network, not just for liquidation, postpone or reconstruction of riverbeds, but also the creation of new objects that collect water. These include settling the waters “dirty”, as well as reservoirs formed in excavation voids as part of a water reclamation. After the end of coal mining operation of these facilities is dependent on hydrology and hydraulic engineering conditions. This problem will be shown on the example of dirty water clarifier and final excavation undergoing water reclamation opencast mining areas Władysławów. Outcrop ended its activities in 2013. The final excavation is no outflow basin with a capacity of 42 million m3, located within the river basin Topiec constituting the left-hand tributary of the Warta.
Accelerating Research
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom
Address
John Eccles HouseRobert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom