z-logo
open-access-imgOpen Access
A pilot study examining changes in dust lead loading on walls and ceilings after lead hazard control interventions.
Author(s) -
Ellen Tohn,
Sherry Dixon,
Richard Rupp,
Shirley E. Clark
Publication year - 2000
Publication title -
environmental health perspectives
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 2.257
H-Index - 282
eISSN - 1552-9924
pISSN - 0091-6765
DOI - 10.1289/ehp.00108453
Subject(s) - lead (geology) , psychological intervention , environmental science , lead exposure , dust control , hazard , environmental health , waste management , engineering , medicine , chemistry , geology , organic chemistry , geomorphology , psychiatry , electrical engineering , latency (audio)
The U.S. Department of Housing and Urban Development (HUD) guidelines on lead hazard control instruct contractors to clean floors, windows, walls, ceilings, and other horizontal surfaces to remove lead-contaminated dust and debris after lead interventions are conducted. This dust removal activity adds costs to each project. The need to clean floors and windows is well documented in the HUD guidelines. However, there is substantially less documentation to support the recommendation to clean walls and ceilings. We examined whether it is necessary to clean walls and ceilings after lead hazard control (LHC) interventions by comparing dust lead loadings measured on these surfaces before an LHC intervention to dust lead loadings after the intervention. Twenty-two dwelling units undergoing substantial LHC measures consistent with the HUD guidelines were enrolled in the study. There was a significant increase in dust lead loading on walls and ceilings between the pre- and postintervention. The change in wall dust lead loading was substantial and created potentially harmful lead exposures. Although statistically significant, the change in ceiling dust lead loading was minimal and the postintervention dust lead loadings were far below the existing federal floor dust lead clearance standard. These results strongly support the recommendations in the HUD guidelines to clean walls after LHC interventions and do not provide sufficient justification to alter the current recommendation to clean ceilings after lead work.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here
Accelerating Research

Address

John Eccles House
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom