Ready-Time Scheduling with Stochastic Service Times
Author(s) -
Thom J. Hodgson,
Russell E. King,
Paul Stanfield
Publication year - 1997
Publication title -
operations research
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 3.797
H-Index - 140
eISSN - 1526-5463
pISSN - 0030-364X
DOI - 10.1287/opre.45.5.779
Subject(s) - computer science , scheduling (production processes) , mathematical optimization , flow shop scheduling , operations research , sequence (biology) , job shop scheduling , production (economics) , job shop , due date , mathematics , schedule , economics , macroeconomics , biology , genetics , operating system
A frequently encountered scheduling problem is to determine simultaneously a material and job ready time and production sequence based on customer-specified due dates. Each job has a stochastic production time and a deterministic due date. The ready time is constrained in that the probability that each job will be complete by its due date must meet some minimum level of confidence. The objective in such an instance is to postpone the ready time as late as possible without violating these constraints. The steps and effort necessary to determine the maximum ready time and optimal production sequence, and cases in which this effort may be significantly reduced are presented. The resulting model is applied directly to single-facility and flow-shop production environments. Methods are shown for scheduling in a dynamic environment.
Accelerating Research
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom
Address
John Eccles HouseRobert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom