z-logo
open-access-imgOpen Access
Fuzzy-Swarm Intelligence-Based Short-Term Load Forecasting Model as a Solution to Power Quality Issues Existing in Microgrid System
Author(s) -
Demsew Mitiku Teferra,
Livingstone Ngoo,
George N. Nyakoe
Publication year - 2022
Publication title -
journal of electrical and computer engineering
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.318
H-Index - 25
eISSN - 2090-0155
pISSN - 2090-0147
DOI - 10.1155/2022/3107495
Subject(s) - microgrid , fuzzy logic , particle swarm optimization , membership function , mean absolute percentage error , electric power system , computer science , term (time) , randomness , adaptive neuro fuzzy inference system , mathematical optimization , fuzzy set , control theory (sociology) , fuzzy control system , power (physics) , mean squared error , statistics , mathematics , artificial intelligence , physics , control (management) , quantum mechanics
Load demand is highly stochastic and uncertain. This is because it was highly influenced by a number of variables like load type, weather conditions, time of day, the seasonality factor, economic constraints, and other randomness effects. The loads are categorized as holiday loads (national and religious), weekdays, and weekend days. The nonlinearity and uncertain characteristics of electrical load in a microgrid are one of the major sources of power quality problems in a microgrid system, and they can be handled using an accurate load forecast model. The fuzzy load prediction model can effectively handle these nonlinearity and uncertainty characteristics to have an accurate load forecast, but the main challenge with this model is its inability to accommodate a large volume of historical load and weather information when the membership function of the input and output fuzzy variables and the number of the fuzzy rules are tremendous. The swarm intelligence load forecast model based on particle swarm optimization algorithms can improve the limitations of the fuzzy system and increase its forecasting performance. The parameters of time, temperature, historical load, and error correction factors are considered as the Fuzzy and Fuzzy-PSO model input variables, while the forecasted industrial load is the only output variable. The Gaussian membership function is considered for both the input and output fuzzy variables. A 3-year historical hourly load data of an Ethiopian industrial system is used to train and validate both prediction models. The mean absolute percentage error (MAPE) is used to evaluate the performance of these prediction models. The Fuzzy-PSO load prediction model shows results that have superior performance to the fuzzy-alone load prediction results.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here
Accelerating Research

Address

John Eccles House
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom