z-logo
open-access-imgOpen Access
[Retracted] Optimization Algorithm of Logistics Transportation Cost of Prefabricated Building Components for Project Management
Author(s) -
Xiaojiang Yang
Publication year - 2022
Publication title -
journal of mathematics
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.252
H-Index - 13
eISSN - 2314-4785
pISSN - 2314-4629
DOI - 10.1155/2022/1460335
Subject(s) - total cost , scheduling (production processes) , prefabrication , component (thermodynamics) , transportation theory , transport engineering , integrated logistics support , computer science , process (computing) , operations research , operations management , mathematical optimization , engineering , business , mathematics , civil engineering , physics , accounting , operating system , thermodynamics
Because the traditional logistics transportation cost optimization algorithm of prefabricated building components has the problems of long transportation time and high transportation cost, a logistics transportation cost optimization algorithm of prefabricated building components for project management is proposed. A project management oriented prefabricated building component management system is built, the logistics and transportation process of prefabricated building components are analyzed, and the logistics vehicles of prefabricated building components under the time window are scheduled. According to the scheduling results, through the waiting unloading time cost, transportation cost, and penalty cost, the total cost objective function is built to obtain the optimal cost. The simulation results show that the proposed algorithm has the shortest logistics transportation time and the lowest transportation cost.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here
Accelerating Research

Address

John Eccles House
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom