Research on Visual Management Technology of Tunnel Construction Process Based on BIM Technology
Author(s) -
Yue Zhou,
Chuang Wang,
Bingxiang Yuan,
Chen Min-jie,
Jianbing Lv
Publication year - 2021
Publication title -
advances in civil engineering
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.379
H-Index - 25
eISSN - 1687-8094
pISSN - 1687-8086
DOI - 10.1155/2021/9738820
Subject(s) - visualization , schedule , process (computing) , construction engineering , construction management , software , field (mathematics) , tunnel construction , building information modeling , scheme (mathematics) , engineering , computer science , engineering design process , systems engineering , civil engineering , scheduling (production processes) , operations management , mechanical engineering , mathematical analysis , mathematics , geotechnical engineering , pure mathematics , programming language , operating system
In order to achieve more efficient management of BIM technology in the field of tunnel construction, this paper took Zhuhai Dahengqinshan No. 1 Tunnel as the project background and studied the visualization management technology of tunnel construction process based on BIM technology. Firstly, we created the 3D geological model and tunnel BIM model by using Revit, 3dsmax, and other software. Secondly, the detailed design was carried out, and there was no gap in the model after the detailed design was checked by ABAQUS software. Then, we checked the problems between disciplines and conducted collision inspection in the model. Finally, we carried out the 4D construction progress simulation to solve the conflict between time and space in the whole life cycle of tunnel construction. The results revealed that the deepening design could optimize the design scheme of tunnel construction engineering. Collision inspection directly exposed problems such as unscientific site layout. 4D construction schedule management could not only realize the visualization of field construction process but also improve the quality of project management compared with traditional means. The research results provide technical experience for the visualization management of tunnel construction.
Accelerating Research
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom
Address
John Eccles HouseRobert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom