Pasternak Model-Based Tunnel Segment Uplift Model of Subway Shield Tunnel during Construction
Author(s) -
Xiangling Tao,
Yunhe Su,
Qi-Yin Zhu,
Wenlong Wang
Publication year - 2021
Publication title -
advances in civil engineering
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.379
H-Index - 25
eISSN - 1687-8094
pISSN - 1687-8086
DOI - 10.1155/2021/8587602
Subject(s) - geotechnical engineering , geology , shield , subgrade , grout , parametric statistics , stiffness , modulus , shear (geology) , structural engineering , engineering , materials science , petrology , statistics , mathematics , composite material
Segment uplift is a frequent problem during the construction of shield tunnels. The phenomenon of segment uplift in Xuzhou Metro Line 1 is investigated. The segment uplift magnitude in the shale layer is quite smaller than that in the clay layer. A tunnel segment uplift calculation model based on the Pasternak foundation beam model is proposed, which considers the hardening process of the grouted body with time. The finite difference method is adopted to calculate the magnitude of segment uplift during different tunnel construction stages, and a numerical solution of segment uplift on the longitudinal direction is obtained. The applicability of the numerical solution is studied by comparing with the field test results and parametric analyses are also performed to investigate the eects of dierent factors on segment uplifting. The results show that the coefficient of subgrade modulus, shear stiffness of the shear layer, and grout pressure all influence the segment uplifting of the tunnel. The influence of the coefficient of subgrade modulus and grout pressure on segment uplift is more significant.
Accelerating Research
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom
Address
John Eccles HouseRobert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom