Improving the Stability of Subsurface Structures in Deep Metal Mines by Stress and Energy Adjustment: A Case Study
Author(s) -
Huanxin Liu,
Xingquan Liu,
Zhuoying Tan,
Yang Liu,
Guilin Li
Publication year - 2021
Publication title -
advances in civil engineering
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.379
H-Index - 25
eISSN - 1687-8094
pISSN - 1687-8086
DOI - 10.1155/2021/6613985
Subject(s) - borehole , excavation , mining engineering , geotechnical engineering , stress (linguistics) , stress field , geology , rock blasting , engineering , structural engineering , finite element method , philosophy , linguistics
In deep hard-rock mines, the failure of subsurface structures (e.g., tunnels, stopes, and shafts) has been a significant problem affecting mining safety due to the high-stress environment. In this paper, the mechanism of structural failure and instability is discussed, and optimized excavation methods are proposed for stress control in deep gold mines. Based on the field observation and investigation of the joints distribution and rock failure modes at 800–1200 m depth of several large gold mines and a typical ultradeep borehole (2017 m depth) in northwest Jiaodong Peninsula, three engineering methods for reducing stress, including the stress transferring by mining optimizations, pressure relief by boreholes, and energy release in advance by optimizations of excavation and support, are analyzed by numerical simulation and field monitoring. Results show that stress reduction by excavation alone is limited and the backfill mining method is more conducive to stress transfer than the opening stope method. Roof contacted backfill can produce an unloading zone around the stope and reduce the stress of the surrounding stope. Relief boreholes can reduce the stress concentration of stopes, but the effect of cutting seams generated by presplitting blasting on pressure relief is not significant. The technology “short excavation and short support” releases less energy. By increasing the bench height and the reasonable timing of support by calculating, the elastic strain energy of rock in the shaft is prereleased, which benefits the long-term stability of the shaft.
Accelerating Research
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom
Address
John Eccles HouseRobert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom