z-logo
open-access-imgOpen Access
Utilization of Waste Glass Powder and Glass Composite Fillers in Asphalt Pavements
Author(s) -
Jayvant Choudhary,
Brind Kumar,
Ankit Gupta
Publication year - 2021
Publication title -
advances in civil engineering
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.379
H-Index - 25
eISSN - 1687-8094
pISSN - 1687-8086
DOI - 10.1155/2021/3235223
Subject(s) - asphalt , glass recycling , composite number , materials science , composite material , filler (materials) , glass fiber , waste management , asphalt concrete , environmental science , engineering
Today, researchers around the globe are looking for suitable alternatives of conventional fillers which can form flexible pavements with satisfactory engineering performance in an environmental friendly and cost-effective manner. This study investigated the engineering, economical, and environmental viability of recycling waste glass powder (GP) and glass-hydrated lime (GL) composite as alternative fillers, in place of stone dust (SD). All fillers were characterized, and asphalt concrete mixes incorporating them at different proportions (4–8.5%) were designed using the Marshall mix design method. The engineering performance of asphalt mixes was analyzed using the static creep analysis, indirect tensile fatigue test, Cantabro test, modified Lottman test, resilient modulus test, mixing time analysis, and boiling water test. Additionally, the design of single km of two-lane flexible pavements utilizing aforesaid mixes was done as per the mechanistically empirical method suggested in IRC 37 guideline. Finally, the economic and environmental analysis was done by comparing their material cost and global warming potential (GWP). GL and GP mixes exhibited better resistance against rutting, fatigue, and low temperature cracking at lower optimum asphalt content than SD mixes. However, GP mixes also displayed poor moisture resistance and adhesion due to the high amount of silica in GP. GL mixes had satisfactory moisture resistance up to 7% filler content due to the fine nature and anti-stripping properties of hydrated lime. The pavement containing GL and GP fillers also reduced material cost and GWP up to 35% while consuming up to 74 tons of GP.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here
Accelerating Research

Address

John Eccles House
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom