Multiobjective Scheduling of Remote-Area Employees with Minimum Cost of Transportation
Author(s) -
Hesham K. Alfares
Publication year - 2014
Publication title -
journal of industrial engineering
Language(s) - English
Resource type - Journals
eISSN - 2314-4890
pISSN - 2314-4882
DOI - 10.1155/2014/978347
Subject(s) - scheduling (production processes) , schedule , integer programming , computer science , operations research , work schedule , work (physics) , job shop scheduling , mathematical optimization , operations management , engineering , mathematics , algorithm , mechanical engineering , operating system
An integer programming model and optimal solution procedure are presented for assigning employees to the (10, 14) days-off schedule. This schedule is used by a large oil company to schedule employees in remote work locations. The primary objective is to minimize the total number of employees. Since employees are flown to their remote work sites, the company also aims to minimize transportation cost. Therefore, secondary objectives include (1) minimizing the number of active days-off work patterns, (2) consistently using the same set of active days-off patterns, (3) assigning work schedules fairly among employees, and (4) avoiding the use of specialized optimization solvers. A rotation schedule is used in which two scheduling rules are enforced: a minimum proportion of weekend days off needs to be given and a maximum limit on the number of successive workdays cannot be exceeded. Utilizing the problem structure, simple optimal procedures are developed to solve this unique complex scheduling problem
Accelerating Research
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom
Address
John Eccles HouseRobert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom