z-logo
open-access-imgOpen Access
The 'Queensway' Mersey Tunnel Entrance Control Project
Author(s) -
D W Honey
Publication year - 1974
Publication title -
the computer journal
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.319
H-Index - 64
eISSN - 1460-2067
pISSN - 0010-4620
DOI - 10.1093/comjnl/17.4.290
Subject(s) - schedule , scheme (mathematics) , division (mathematics) , control (management) , computer science , operations research , transport engineering , civil engineering , engineering , operating system , artificial intelligence , mathematical analysis , mathematics , arithmetic
In 1968, A computer-controlled system was installed by the City of Liverpool to schedule vehicles on the approaches to the "Queensway" Mersey tunnel. In 1972, the scheme was extended by their own Engineering Division, to provide direct control of the traffic entering the tunnel itself. This paper discusses the project, together with some of the problems encountered in the design of the scheme. Flow measurements have shown an overall increase of about 5 percent, in hourly flows. The success of the scheme is reflected by its smooth operation, even at the peak of commuter flow. A considerable reduction in vehicle breakdowns within the tunnel has been experienced. Air pollution inside the tunnel caused by vehicle exhausts in much less when fluid conditions are maintained, and the fact that traffic is delayed less on the approaches infers that external pollution is also reduced. Additional traffic-sensitivity has been introduced into the computer program to enable the system to react more rapidly to changing conditions, and in the near future, it is hoped to predict approach delays by sampling the flow throughout the tunnel.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here
Accelerating Research

Address

John Eccles House
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom