COMMISSIONING OF THE CMS CRYOGENIC SYSTEM AFTER FINAL INSTALLATION IN THE UNDERGROUND CAVERN
Author(s) -
T. Dupont,
Jean-Christophe Courty,
G. Perinić,
J. G. Weisend
Publication year - 2010
Publication title -
aip conference proceedings
Language(s) - English
Resource type - Conference proceedings
SCImago Journal Rank - 0.177
H-Index - 75
eISSN - 1551-7616
pISSN - 0094-243X
DOI - 10.1063/1.3422381
Subject(s) - refrigeration , refrigerator car , magnet , solenoid , nuclear engineering , engineering , superconducting magnet , environmental science , automotive engineering , mechanical engineering
After having served for the surface tests of the Compact Muon Solenoid (CMS) magnet, the cold box and ancillaries of the CMS helium refrigerator have been dismantled, moved and re-installed in the USC55 cavern in 2007. The full re-commissioning in the cavern has been followed by several tests of the refrigerator to confirm its nominal performance before it was used for the magnet and detector tests in 2008. During these tests the safety modes of the refrigeration system have been tested and improved. After a nine-year project both, the magnet and the refrigeration system are now ready for the CMS operation
Accelerating Research
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom
Address
John Eccles HouseRobert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom