The scheduling of construction work under the assumption of brigade multitasking
Author(s) -
Michał Krzemiński
Publication year - 2017
Publication title -
procedia engineering
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.32
H-Index - 74
ISSN - 1877-7058
DOI - 10.1016/j.proeng.2017.11.021
Subject(s) - human multitasking , downtime , scheduling (production processes) , tardiness , computer science , engineering , industrial engineering , operations research , job shop scheduling , embedded system , operations management , operating system , psychology , routing (electronic design automation) , cognitive psychology
In this article the method of minimization of downtime in scheduling construction works is presented. Essentially, the method is based on the assumption of brigade multitasking. This phenomenon is currently being noticed at Polish construction sites. The goal of the author was to develop a method based on mathematic removal of downtime which would let take advantage of the brigade multitasking at the stage of processing the scheduling of construction works. In this article the description of the method is presented, as well as an example of its application.
Accelerating Research
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom
Address
John Eccles HouseRobert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom