Development of Renovation Techniques for Medium and Large Diameter Water Transmission Pipes
Author(s) -
C. Bae,
J. Kim,
Doo Yong Choi,
Dan Koo
Publication year - 2014
Publication title -
procedia engineering
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.32
H-Index - 74
ISSN - 1877-7058
DOI - 10.1016/j.proeng.2014.11.512
Subject(s) - transmission (telecommunications) , environmental science , materials science , environmental engineering , civil engineering , marine engineering , engineering , telecommunications
Smart lining System was developed to restore and improve water quality, hydraulic, and structural function of water large transmission pipes through the construction of the high quality lining in the study. Smart lining System consists of smart cleaning, smart spray-on lining, and smart CIPP2+. Smart cleaning is the pre-process of lining process, and could ensure SSPC SP-10 and surface roughness 50 μm(Rz) as the quality of surface preparation for the lining by removing effectively deposited slime, residual lining, tuberculation, graphitization of pipe wall with the high pressure water jet, mechanical scraper, and air spin-head blasting equipment step by step
Accelerating Research
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom
Address
John Eccles HouseRobert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom