z-logo
open-access-imgOpen Access
Forensic Engineering Analysis of an Emergency Bridge Replacement Project
Author(s) -
Paul G. Swanson
Publication year - 2015
Publication title -
journal of the national academy of forensic engineers
Language(s) - English
Resource type - Journals
SCImago Journal Rank - 0.102
H-Index - 1
eISSN - 2379-3252
pISSN - 2379-3244
DOI - 10.51501/jotnafe.v32i1.7
Subject(s) - bridge (graph theory) , bidding , procurement , engineering , settlement (finance) , damages , transport engineering , civil engineering , construction engineering , forensic engineering , business , law , finance , political science , payment , medicine , marketing
A bridge that provided grade separation and vehicle access over a commercial rail line in a small town in the Southeast had sustained soil erosion and settlement as a result of a severe storm. Replacement of the bridge was undertaken by the State Department of Transportation as an emergency project in cooperation with the Federal Highway Administration using the design-build procurement method. Subsequent to the bidding, the design-build team made several changes to the bridge foundations and superstructure that significantly increased the cost of construction. The contractor claimed damages against the other members of the design-build team resulting from design errors and an alleged breach of the customary standards associated with the design-build concept.

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here
Accelerating Research

Address

John Eccles House
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom