Study on Time and Resource Management in Construction Projects Using MS Project
Author(s) -
T. Subramani,
T M.Karthick
Publication year - 2018
Publication title -
international journal of engineering and technology
Language(s) - English
Resource type - Journals
ISSN - 2227-524X
DOI - 10.14419/ijet.v7i3.10.15622
Subject(s) - schedule , project management , computer science , table (database) , scheduling (production processes) , resource (disambiguation) , task (project management) , software project management , track (disk drive) , project planning , operations research , software , time management , operations management , database , software development , systems engineering , engineering , computer network , software construction , operating system , programming language
This construction project study about excessive stake endeavor aiming at time certain programmed performance goal. Except combine resources are deliberate and procured, no activity may be completed in line with a pre fixed time table. Project managers ought to take complicated choices under exceptional scheduling desires and below situations of uncertainty that every so often expand past assignment intervals. Our project study offers with useful resource scheduling for a quick track project with constrained intervals. The learning has been executed in stages. Inside the first segment, with the useful resource of MS PROJECT software task time table for numerous activities for the development of a business constructing become prepared. Finally, requirements of sources had been attributed to the activities primarily depend on Standard Schedule Rates. The considered necessary necessity information collected from the designated drawings and triumphing site online situations. The analysis was completed with the aid of useful resource leveling for diverse activities by way of reducing resources with accelerated length to observe the time-cost implications.