z-logo
open-access-imgOpen Access
Impact of Improvement of the Entrance Channel on the Rate of Sediment Deposition into the Dar es Salaam Harbour
Author(s) -
Imani Sanga,
Alfonse Dubi
Publication year - 2007
Publication title -
western indian ocean journal of marine science
Language(s) - English
Resource type - Journals
ISSN - 0856-860X
DOI - 10.4314/wiojms.v3i2.28454
Subject(s) - dredging , harbour , sedimentation , channel (broadcasting) , sediment , deposition (geology) , oceanography , hydrology (agriculture) , bathymetry , erosion , settling , environmental science , structural basin , geology , geomorphology , geotechnical engineering , environmental engineering , engineering , computer science , programming language , electrical engineering
The study reported here sought to investigate the effect that the dredging of the harbour basins and the entrance channel has had on sediment deposition rate into the Dar es Salaam harbour. Echo-sounding was carried out along berths No 2, 3, 4, 6, 7 and 8 as a means of detecting changes to their bathymetry in the four years since 1998, when the dredging commenced. Concentrations of transported sediments into and out of the harbour were determined using sediment traps. Short-term measurement of waves and currents were also carried out. Sediment traps, a wave-gauge and a current-meter were deployed in the entrance channel during the South East and North East monsoon seasons respectively.Our results reveal that the sedimentation rates after improvement of the channel arebetween 13 and 43 cm/year. Rates of sedimentation before dredging were relatively low, atbetween 7 and 25 cm/year. There are two reasons for the difference in rates. First, the settling of fine particles as a result of dredging activities, and second, the change of channel alignment and subsequent erosion on Ras Makabe. The eroded sediments were probably deposited into the harbour basin by the flood tide. This trend has the implication that the harbour basin will need more frequent dredging than it did before improvement of the entrance channel: In the past, with a maximum sedimentation rate of 25cm/year, it took 20 years before the harbour basin needed to be dredged. At the present sedimentation rate (maximum of 43cm/year), it will take only 11 years before re-dredging is necessary. Keywords : Dar es Salaam harbour, sediment deposition, entrance channel West Indian Ocean Journal of Marine Science Vol. 3 (2) 2004: pp. 105-112

The content you want is available to Zendy users.

Already have an account? Click here to sign in.
Having issues? You can contact us here
Accelerating Research

Address

John Eccles House
Robert Robinson Avenue,
Oxford Science Park, Oxford
OX4 4GP, United Kingdom