Automatic Pipeline Route Design with Multi-Criteria Evaluation Based on Least-Cost Path Analysis and Line-Based Cartographic Simplification: A Case Study of the Mus Project in Turkey
Details
The content you want is available to Zendy users.Already have an account? Click here. to sign in.